How to Quote an Electrical Job UK: Pricing Guide for Electricians (2026)
Written by Tom Ellis · Senior Trades Editor
Last updated: August 2026
Quick Answer
To quote an electrical job in the UK, charge labour at £40–£65/hr (sole trader) or £55–£85/hr (NICEIC/NAPIT contractor), add materials at cost plus 20–30% markup, and include certification fees — Part P notification costs £250–£500, an EICR costs £150–£400 depending on property size. Always quote in writing. Electricians who quote same-day win significantly more work than those who delay.
Undercharging is one of the most common problems for self-employed electricians. The work is skilled, the certification responsibilities are real, and the liability is significant — yet many electricians quote on gut feel and end up absorbing costs they should have been charging for. This guide breaks down how to price electrical work correctly in 2026, with labour rates, job-type benchmarks, a worked example, and the certification costs that are most often forgotten.
Why Electricians Undercharge: The Common Patterns
Most undercharging in electrical work falls into one of three categories. The first is not marking up materials. When you supply a consumer unit, cable, accessories, and fixings, you are carrying the cost of procurement, the risk of price changes, and the responsibility for material suitability. Supplying at trade cost and billing the customer at the same price is giving that value away. A 20 to 30% markup on materials is standard, industry-wide, and entirely legitimate.
The second is forgetting certification and notification fees. Part P notification, EICR testing, and the time involved in producing documentation are real costs. Electricians who build their prices from labour hours alone and treat certs as "included" are effectively subsidising their customers' compliance obligations. These fees should appear as explicit line items in every relevant quote.
The third is underestimating access and chasing time. A job that looks like two hours of cable work on the doorstep can turn into a full day once you account for lifting floorboards, chasing through plaster, dealing with awkward ceiling voids, or navigating a loft full of insulation. Always inspect before committing to a fixed price on any job where the cable route is not completely visible and obvious.
Electrician Labour Rates UK 2026
The right rate for your work depends on your level, your accreditation, and whether you are working in London and the South East or the rest of the country. The figures below reflect the market as of 2026.
| Electrician type | Hourly rate | Day rate |
|---|---|---|
| Apprentice / mate | £20–£30/hr | £140–£200/day |
| Qualified sole trader | £40–£65/hr | £280–£450/day |
| NICEIC / NAPIT approved contractor | £55–£85/hr | £380–£600/day |
| Emergency / out-of-hours | 1.5–2× standard rate | — |
London and the South East typically sit at the top of these ranges or 10 to 15% above them. If you are a sole trader with an ECS card and relevant experience but charging below £40/hr, you are almost certainly undercharging relative to the market and relative to your skill level. Day rates are most appropriate for multi-day jobs where a customer wants certainty; hourly rates suit smaller call-out and diagnostic work.
Electrician Hourly Rates by Region (2026)
Rates vary significantly across the UK — London electricians typically charge 30–50% more than those in the North.
| Region | Sole Trader (£/hr) | NICEIC/NAPIT (£/hr) | Day Rate |
|---|---|---|---|
| London | £60–£85 | £80–£110 | £450–£650 |
| South East | £55–£75 | £70–£95 | £400–£550 |
| Manchester / Leeds | £40–£60 | £55–£80 | £300–£420 |
| Birmingham | £40–£58 | £55–£78 | £300–£400 |
| Bristol | £45–£65 | £60–£85 | £330–£460 |
| Edinburgh / Glasgow | £40–£58 | £55–£75 | £300–£400 |
| North East / Wales | £35–£50 | £50–£68 | £260–£360 |
Certification and Notification Costs (Frequently Forgotten)
Certification and compliance costs are among the most commonly omitted line items in electrical quotes. They are real costs and should always be itemised explicitly, both so the customer understands what they are paying for and so you do not end up absorbing them yourself.
EICR (Electrical Installation Condition Report)
£150–£400 depending on property size. A one-bed flat typically comes in at £150–£200; a four-bed house with multiple circuits will be £300–£400 or more. Charge based on the number of circuits and the time required to test and document them, not a flat fee per property.
Part P notification
£250–£500 for new circuits notifiable under Part P of the Building Regulations. Required for new circuits in kitchens, bathrooms, outdoors, and any new circuit in a dwelling regardless of location if you are not a Competent Person scheme member. If you are registered with NICEIC, NAPIT, or ELECSA, you self-certify and avoid the local authority fee — this is a significant competitive advantage worth communicating to customers.
Electrical Installation Certificate (EIC)
Included within the job price — there is no separate third-party fee, but the time to produce and sign the certificate should be reflected in your labour estimate. Customers should be told they will receive one; many do not know it exists until they come to sell their property.
Minor Works Certificate
Included within the job price. Applies to additions to existing circuits where no new circuit is introduced. Again, there is no third-party fee, but production time should be accounted for in your overall labour estimate for the job.
Electrical Job Pricing Guide UK 2026
The ranges below are typical for domestic electrical work in the UK in 2026. Prices include labour and materials unless otherwise noted. They do not include VAT where applicable.
| Job type | Typical price range | Notes |
|---|---|---|
| Single socket addition | £80–£150 | Spur from existing circuit |
| EICR — 1-bed flat | £150–£200 | Up to ~6 circuits |
| EICR — 4-bed house | £300–£400 | 12–16 circuits, older properties at upper end |
| Consumer unit replacement | £600–£1,200 | Includes testing, cert, and Part P |
| New circuit installation | £300–£600 | Includes EIC; Part P extra if not self-certifying |
| EV charger installation | £700–£1,200 | OZEV grant may apply; DNO notification may be needed |
| Full rewire — 3-bed house | £3,500–£6,000 | Higher if property is occupied throughout |
| Outdoor lighting circuit | £400–£700 | Includes new circuit, IP-rated fittings, Part P |
Minimum callout charge of £80–£120 should apply to any visit regardless of how small the job turns out to be. Your time getting there, diagnosing the issue, and returning has real value. State the callout fee clearly in advance and apply it consistently.
How to Apply Materials Markup
When you supply materials — cable, consumer units, accessories, trunking, fixings — you should bill the customer at your sell price, not your trade cost. Your sell price is your trade cost plus a markup of 20 to 30%. This is standard practice, not profiteering: you are compensating for the time spent sourcing and collecting materials, the cost of any over-ordering or wastage, and the risk of price changes between quoting and buying.
Most electricians buy materials from trade accounts at CEF (City Electrical Factors), Rexel, or Screwfix Trade. Your account pricing at these suppliers is your cost. Apply your markup consistently across all materials in the quote — do not apply it selectively or customers may question why some items are priced differently.
The simplest approach is to total all materials at trade cost, then multiply by 1.25 (25% markup) or 1.30 (30% markup). Show this on the quote as a single "Materials" line or as grouped categories (cable, accessories, consumer unit, etc.), rather than itemising every nut and bolt at retail. Customers do not expect a receipt from your wholesaler — they expect a fair all-in price for the work.
For a broader view of how materials markup works across all trades, the material markup guide for UK tradesmen covers the full framework in detail.
Worked Example: Quoting a Consumer Unit Replacement
Consumer unit replacements are one of the most common jobs for domestic electricians. Here is how to build the quote properly, line by line.
Job: Replace existing fuse board with 18-way dual RCD consumer unit — 3-bed semi, 12 existing circuits
| Item | Cost |
|---|---|
| Survey / initial assessment (0.5 hr @ £50/hr) | £25 |
| Labour — isolation, swap, reconnect, testing (5 hrs @ £50/hr) | £250 |
| 18-way dual RCD consumer unit (trade £120 + 25% markup) | £150 |
| MCBs, blanks, tails, fixings (trade £60 + 25% markup) | £75 |
| Testing and commissioning (1 hr @ £50/hr) | £50 |
| Part P notification (local authority building control) | £300 |
| Electrical Installation Certificate (included in labour) | £0 |
| Waste disposal (old board) | £20 |
| Total | £870 |
Note: if the electrician is NICEIC or NAPIT registered, they self-certify and the £300 Part P local authority fee is replaced by a much lower scheme notification cost (typically £25–£60), reducing the total to approximately £600. This illustrates why scheme membership has tangible financial value — both to you and to the price you can offer customers.
This example comes to £870 without VAT. A non-registered electrician who quoted a flat "£600 including everything" on gut feel would be undercharging by £270 before their costs are even considered. The difference between pricing from the bottom up and pricing from a round number is the difference between a profitable job and one you regret taking.
Access and Chasing: The Hidden Time Cost
Access and chasing are the most common source of underpricing on electrical jobs. A cable run that looks like two cable clips on the surface can involve lifting floorboards across an entire floor, threading through insulated ceiling voids, cutting through original lath and plaster, or threading around structural elements that were not visible on the site visit.
Before committing to a fixed price on any job where cable routing is not completely obvious, carry out a proper inspection. Ask the customer to lift furniture away from walls, take photos or video of accessible void spaces, and use a cable avoidance tool to trace existing routes. If you genuinely cannot determine the full route and difficulty before quoting, say so and quote accordingly — either with an explicit allowance for chasing time or with a note that access costs will be confirmed once the route is opened up.
Making good after chasing — filling, skimming, and repainting — is often assumed by customers to be included. Be explicit about whether this is within your price or whether the customer is responsible for making good after you have completed the electrical work. Many electricians exclude decoration but offer basic filling as a courtesy. Whatever your position, state it clearly on the quote.
A reasonable rule of thumb: add one hour of access and chasing time for every new circuit run in a finished (plastered and decorated) property, and two hours for period properties with solid walls, original features, or difficult loft access.
Sending the Quote: Format, Timing, and Payment Terms
Send the quote the same day as the site visit. Customers contact multiple electricians and whoever responds first and most professionally often wins the job, even at a slightly higher price. A same-day quote signals that you are organised, that you take the job seriously, and that you will be responsive when the work is underway.
Send the quote as a PDF. A typed, clearly structured document on headed paper looks significantly more professional than a WhatsApp message with a number in it. The PDF invoice generator on Sleepless Tradesman lets you produce properly formatted documents in a few minutes, which you can email or share directly with the customer.
State a 30-day validity period clearly near the top of the document. Material prices change, your diary fills up, and a property you visited in July may not be the same situation in November. Thirty days creates a natural prompt for the customer to commit and gives you a legitimate basis to revise the price if they come back months later.
For jobs over £500, ask for a 50% deposit before starting. This is standard practice on larger electrical jobs and most customers expect it. It covers your material costs at minimum and ensures you are not out of pocket if the customer cancels after you have ordered and collected a full set of parts. State your payment terms clearly on the quote: deposit amount, when the balance is due (typically on completion or within 7 days), and your preferred payment method.
Related guides
Sleepless Tradesman
Quote, invoice and manage jobs — all in one app
Join thousands of UK tradespeople running their admin from their phone. Free to start, no card needed.
Frequently Asked Questions
Do electricians charge for a quote?
Most electricians do not charge for a quote on standard domestic work such as socket additions, EICR inspections, or consumer unit replacements. However, for large or complex jobs — full rewires, commercial installations, or jobs requiring a detailed survey — it is entirely reasonable to charge a survey fee of £50 to £150, which is typically deducted from the final invoice if the work proceeds. If you are spending more than an hour assessing a site and producing a detailed breakdown, your time has value and you should charge for it. Be upfront about the survey fee when the customer first contacts you so there are no surprises when you arrive.
What is included in an electrical quote?
A complete electrical quote should itemise labour hours and rate, materials at sell price (trade cost plus markup), any certification fees (EICR, Part P notification, EIC), testing and commissioning time, and any access or chasing work required to route cables. Exclusions should be stated clearly — for example, whether making good after chasing is included, whether the price covers any remedial work discovered during an EICR, and whether the customer or electrician is responsible for arranging Part P building control notification where the electrician is not a Competent Person scheme member.
Should I charge VAT on electrical work?
If you are VAT-registered, you must charge VAT at 20% on all supplies including labour and materials, and show the net price, VAT amount, and gross total separately on the quote. If your taxable turnover is below the £90,000 registration threshold, you are not registered and should not charge or mention VAT at all. New residential builds and certain conversions may qualify for the 5% reduced rate or zero rating on labour — this is a complex area governed by the VAT Act 1994 and relevant HMRC notices, and if you regularly work on new builds you should confirm the correct rate with your accountant. Charging 20% VAT on zero-rated supplies is an error that can result in penalties and will need correcting.
Can I give a fixed price for a rewire?
Yes, and for most domestic rewires you should. A fixed price gives the customer certainty and demonstrates that you have assessed the job thoroughly. Visit the site, walk every room, count the circuits and outlet positions, check the consumer unit location and tails entry point, assess the access difficulty room by room, and confirm whether the property will be occupied throughout. Include an explicit exclusion for any asbestos, structural issues, or hidden problems not identifiable at survey stage. If you find unexpected complications once the work is underway — concealed asbestos insulation board, undersized earthing conductors requiring DNO involvement, or structural elements preventing direct cable routes — issue a variation in writing before doing any additional work outside the quoted scope.
What if I find extra faults during the job?
Stop before doing any remedial work and contact the customer with a written variation detailing what was found, why it needs fixing, and the additional cost. This is especially common on EICRs, where C1 (immediate danger) and C2 (potentially dangerous) observations require remediation before a satisfactory certificate can be issued. If the customer declines remedial work on a dangerous fault, you cannot issue a satisfactory EICR and should note on the report that the certificate cannot be issued until the identified faults are remediated. Never carry out unquoted remedial work and add it to the invoice without prior written agreement — the customer can legitimately refuse to pay for anything outside the original quoted scope and you will have limited recourse if they do.
Quote and invoice electrical jobs faster
Sleepless Tradesman Pro lets you generate professional PDF quotes and invoices, track payment status, and manage your electrical jobs from one place. Same-day quoting is easier when the paperwork takes minutes instead of an hour.
Related Guides and Tools
How to Price a Job as a Tradesman UK
Full framework for calculating what to charge
Material Markup Guide for UK Tradesmen
How much to mark up materials on a quote
Tradesman Call-Out Fee Guide UK
What to charge for call-outs and how to include them in quotes
Hourly Rate Calculator
Work out the right labour rate for your trade
Profit Margin Calculator
Check the margin on any quote before sending it
PDF Invoice Generator
Create professional PDF quotes and invoices in minutes