Free Builder Quote Template UK (2026) — Editable & Professional

Written by Tom Ellis · Senior Trades Editor

Last updated: August 2026

Quick Answer

A UK builder's quote template must include: your business name and UTR/company number, the customer's name and site address, a unique quote reference and date, detailed scope of work broken into sections, separate labour and materials line items, VAT treatment (net + VAT + gross if registered), a 30-day validity period, and your payment terms. A quote is legally binding once accepted — an estimate is not. Always issue quotes as a PDF, not a verbal price or WhatsApp message.

Whether you are pricing a kitchen extension, a loft conversion, or a full house renovation, sending a professional written quote is one of the most important steps you can take to win the job and protect yourself legally. This page gives you a complete builder's quote template you can adapt for any project, along with guidance on what must be included, the legal difference between a quote and an estimate, and how to handle price negotiations without cutting your margin.

What a Professional Builder's Quote Must Include

A builder's quote for any project of meaningful size should cover the following as a minimum. Omitting any of these creates gaps that can cost you money or create disputes.

  1. Your business details — trading name, address, phone, email, UTR number (sole traders) or company registration number (Ltd), and VAT number if registered
  2. Customer details — full name, home address, and the site address if the works are at a different property
  3. Quote reference number and date issued — a simple sequential number (e.g. QT-2026-047) makes filing and follow-up straightforward
  4. Valid until date — 30 days from the date of issue is standard; beyond this, material prices and your availability may have changed
  5. Detailed scope of work broken into sections— for example, Groundworks, Brickwork, Roofing, Windows & Doors, First Fix, Plastering, Decoration; each section should describe what is included
  6. Labour line items — either as a fixed price per section, a day rate multiplied by estimated days, or a combined labour cost per section
  7. Materials line items— either itemised per section or as a combined line per section; specify brand or specification where it affects the customer's decision
  8. Exclusions — be explicit about what is NOT included: structural engineer fees, planning fees, party wall surveyors, making good decoration after chasing, disposal of hazardous materials, any specialist subcontractor work not mentioned
  9. Payment terms — for larger jobs, break this into stage payments tied to visible milestones (e.g. roof completion, plastering completion); always specify your deposit requirement
  10. VAT treatment— if registered, show net total, VAT at 20%, and gross total as separate lines; if not registered, state "VAT not applicable — not VAT registered"
  11. Your signature, printed name, and date — signing the quote shows professionalism and makes the document feel like a formal proposal

The exclusions section is the one most commonly skipped, and it is the one that causes the most disputes. If you do not write down that your price excludes the structural engineer's calculations, the customer will assume you have factored that cost in. A thorough exclusions list protects you and makes your quote easier for the customer to compare fairly against others.

Builder Quote Template — Worked Example

The example below shows a realistic quote for a single-storey kitchen extension. Adapt the sections and figures for your own job. The structure works for any building project from a garage conversion to a two-storey rear extension.

RUSSELL'S BUILDING SERVICES
14 Oak Lane, Manchester M1 2AB
Tel: 07700 900123  |  Email: russell@russellbuilding.co.uk
UTR: 12345 67890  |  VAT not applicable — not VAT registered
QUOTATION
Quote Ref: QT-2026-047
Date Issued: 6 August 2026
Valid Until: 5 September 2026
Prepared for:
Mr & Mrs Thompson
42 Birchwood Road
Manchester M14 5EF
Description of Works:
Single-storey rear kitchen extension — approx. 25m² floor area, as discussed on site visit 2 August 2026.
Section / DescriptionLabourMaterialsTotal
1. Groundworks
Strip foundations, excavation, concrete footings, DPC, drainage connections
£1,800£950£2,750
2. Blockwork
Cavity wall construction, insulation batts, DPC, tie-ins to existing
£2,200£1,400£3,600
3. Roof
Flat roof — EPDM single-ply membrane, OSB deck, timber joists, insulation to current Building Regs U-value, guttering and downpipes
£1,600£2,100£3,700
4. Windows & Doors
Supply & fit 2 × uPVC casement windows (600×900), 1 × aluminium bifold door (2.1m wide) — colour: grey RAL 7016
£800£3,200£4,000
5. First Fix
Electrician subcontractor (TBC — allow), plumber subcontractor (TBC — allow), underfloor heating pipework supply & lay
£2,500£600£3,100
6. Plastering
Dot-and-dab plasterboard to all internal walls and ceiling, skim coat finish throughout
£1,200£700£1,900
7. Decoration
Prime coat to all new plasterwork only — finish decoration by client or separate contractor
£350£150£500
8. Waste Disposal
Skip hire, removal of excavated material and construction waste
£650£650
Subtotal£20,200
Contingency allowance — 10% (groundworks & unforeseen)£2,020
TOTAL (no VAT — not registered)£22,220
Payment Schedule:
20% deposit on commencement — £4,444
30% on completion of roof stage — £6,666
30% on completion of plastering — £6,666
20% on practical completion — £4,444
Exclusions (not included in this quote):
— Planning permission or Building Regulations application fees
— Structural engineer drawings or calculations
— Party wall surveyor (if required)
— Kitchen units, worktops, or appliances
— Floor finishes (tiling, vinyl, engineered wood)
— Finish decoration (painting, feature walls)
— Any asbestos removal or hazardous material treatment
— Unforeseen hidden structural defects not visible at survey
Validity:
This quotation is valid for 30 days from the date above. After 5 September 2026 we reserve the right to revise the price to reflect any changes in material costs or availability.
Authorised by:
Signed: _______________________   Date: _____________
Russell Brooks, Russell's Building Services
Customer acceptance: By signing below or confirming acceptance by email, the customer confirms agreement to the above scope, price, payment terms, and exclusions.
Customer signature: _________________   Date: _____________

Common Mistakes with Builder Quotes

Most disputes between builders and customers come back to one of a small number of easily avoidable errors in the original quote.

Quote vs Estimate: The Legal Difference

In UK contract law, a quote(or quotation) is a fixed offer. Once the customer accepts it — even by a simple email reply saying "please go ahead" — a contract is formed at that price. You cannot raise the price after acceptance unless unforeseen work arises that was genuinely outside the scope described in the document.

An estimate is an approximation. It signals that the final price may differ from the figure given, typically because the full extent of the work cannot be determined until it is underway. Estimates are common for investigative or remedial work — for example, re-pointing a chimney where the full extent of the damage is not visible until scaffolding is up.

In practice, many builders use the words interchangeably. This is a mistake. If your document is headed "Quotation" but you later try to add 20% to the final invoice, the customer has strong grounds to refuse. If it is headed "Estimate" and you come in exactly on the figure, the customer will treat it as a fixed price anyway.

The safest approach is to use fixed quotes wherever the scope is reasonably well defined, and to issue estimates only for genuinely open-ended investigative work — with a clear note on the document explaining why the final cost may vary and how you will notify the customer before any variation is actioned.

How to Send the Quote

Send your quote as a PDF by email — not as a WhatsApp message, a text, or a verbal price on the doorstep. A PDF on headed paper looks significantly more professional, is easy for the customer to forward to a partner or mortgage broker, and gives you both a document to refer back to.

Timing matters. Send the quote the same day as the site visit, or at the very latest within 24 hours. Customers typically contact three or four builders simultaneously. Whoever responds first and most professionally often wins the job, regardless of price. A quote that arrives five days after the site visit signals poor organisation — and customers extrapolate from that to how you will run the job itself.

Follow up by phone three days after sending. A simple call — "Just checking the quote arrived okay and to see if you have any questions" — converts a meaningful proportion of quotes that would otherwise go cold. Most customers are not ignoring you; they are just busy. A brief follow-up reminds them to make a decision and gives you the chance to address any concerns before they go with someone else.

Adjusting Your Quote for Location

Labour costs vary significantly across the UK. When completing your quote template, use regional rates that reflect your local market — not national averages.

RegionTypical Builder Day RateExtension Cost (per m²)
London£280–£400£2,000–£3,000
South East£250–£350£1,800–£2,500
Manchester / Leeds£200–£280£1,400–£2,000
Birmingham£200–£275£1,400–£1,900
Edinburgh / Glasgow£200–£270£1,400–£1,900
North East / Wales£180–£250£1,200–£1,700

When a Customer Wants to Negotiate

When a customer pushes back on price, the single most important principle is to reduce scope, not margin. Never agree to do the same job for less money. Instead, ask the customer what they would like to remove from the scope to bring the cost down. This has two effects: it makes clear that your original price was fair for the work it covered, and it shows the customer that you cannot simply conjure money from thin air.

A useful conversation goes like this: "I can get closer to your budget if we defer the bifold door and fit a standard French door for now — that saves around £1,800. The opening is already built so you could upgrade later. Would that work?" This protects your margin entirely while giving the customer a genuine option.

If the customer is comparing you to a significantly cheaper quote, ask to see the scope of that quote before responding. In most cases, the cheaper quote has different exclusions, different materials specifications, or has simply not priced the contingency. Talking through what your quote covers that theirs does not is a far stronger sales conversation than matching their price.

Frequently Asked Questions

Is a builder's quote legally binding?

Yes. In UK law, a quote is a fixed offer. Once the customer accepts it in writing — even by email — a binding contract is formed at that price for that scope of work. You cannot unilaterally raise the price after acceptance unless unforeseen work arises that was genuinely outside the quoted scope. This is why it is critical to include a clear scope description, exclusions, and a validity period on every quote you send.

Should a builder charge for a quote?

For most domestic jobs, builders quote for free as a cost of winning work. However, for complex projects — extensions over £50,000, new builds, commercial jobs — charging a fee of £100 to £500 for a detailed quoted specification is increasingly common and entirely reasonable. A fee filters out unserious enquiries and compensates you for the time spent on a proper take-off. If you charge, make it refundable against the project cost if you win the job.

What is the difference between a quote and an estimate?

A quote is a fixed price offer for a defined scope of work. If the customer accepts it and you complete the work as described, they must pay the quoted price. An estimate is an approximation — it can change as the job progresses and more information becomes available. In practice, many builders use the terms interchangeably, but the legal distinction matters. If your document says 'quote' or 'quotation', you are bound by that price. If it says 'estimate', you have more flexibility, but customers may feel misled if the final invoice is significantly higher.

How long should a builder's quote be valid?

30 days is the standard validity period for a builder's quote. Material prices — especially timber, steel, and insulation — can move significantly over a few months, and your availability changes too. Include a clear 'valid until' date at the top of the quote. After the deadline, you are entitled to reissue a revised figure. For large projects where the customer needs planning permission or mortgage confirmation before proceeding, consider issuing a preliminary indication and then a formal fixed quote once they are ready to commit.

Do I need to include VAT on my quote?

Only if you are VAT-registered. If your taxable turnover exceeds £90,000, you must register and charge 20% VAT on most building work. Show the net price, VAT amount, and gross total as separate lines. If you are not VAT-registered, do not mention VAT at all — charging it without being registered is illegal. Note that certain building work (new builds, conversions from non-residential use) may be zero-rated or 5% reduced-rated; check with HMRC or your accountant if you are unsure.

Related guides

Sleepless Tradesman

Quote, invoice and manage jobs — all in one app

Join thousands of UK tradespeople running their admin from their phone. Free to start, no card needed.

Related Guides and Tools